Evaluation of the effectiveness of hydraulic fracturing on the objects of the South-Yagunsky field

Бесплатный доступ

The facilities of the Yuzhno-Yagunsky field have been developed since 1978. Since 1995, a hydraulic fracturing has been used at the BS10, BS11 and YuS1 facilities. This made it possible to increase the average daily flow rate and, in some cases, reduce the water cut due to an increase in the coverage ratio.

Hydraulic fracturing, oil field, well

Короткий адрес: https://sciup.org/140237100

IDR: 140237100

Статья научная